Chew toys are the durability-led core of the dog toy range. The Rena Pet catalogue lists model D1071 as a rubber chew toy, and models D1060 and D1062 with nylon toy titles — note that their recorded breadcrumb is Rubber Toy, and they are listed under it in the table below.
Chew is also the category where honest positioning pays: sell the right chew strength to the right dog and reviews follow.
The chew titles in the catalogue cover rubber formats and nylon-style formats, but they do not grade them by chewer type. Confirm which construction suits your target chewer per design when you brief, and whatever grading you adopt for your range, label it clearly on pack.
Shapes follow chewing ergonomics: bones, sticks and ring formats that dogs can hold between their paws. Flavour-free material stories and easy-clean surfaces are the common specification requests; confirm your target chewer grade when you brief, and ask for constructions to be mapped to it at sampling.
Chew toys are compact and ship well mixed with plush and rope lines. Samples are typically ready in one week; production lead time is 40 to 50 days.
The models below are listed in the current Rena Pet catalogue under this range. Model codes, catalogue titles and ranges are reproduced as recorded in the catalogue — including titles that consist of the model code itself. Before ordering, confirm the final specification — and which customization options apply to the specific design — when you request a quotation.
| Model | Catalogue listing | Range |
|---|---|---|
| D1071 | Rubber toy, Chew toy, Durable toy | Dog Toys / Rubber Toy |
| D1060 | Dog Toys, Dog Nylon Toys, Nylon Toys | Dog Toys / Rubber Toy |
| D1062 | Dog Toys, Dog Nylon Toys, Nylon Toys | Dog Toys / Rubber Toy |
Private label customization is part of the Rena Pet program. Confirm, per design at quotation, which elements — logo application, printed artwork, colours, packaging — apply.
Samples are typically ready in one week. Production lead time is 40 to 50 days; confirm order quantities per design in the quotation.
Tell us which range you are sourcing, your target market and your packaging requirements. Samples are typically ready in one week, and production lead time is 40 to 50 days.
Request a Quote